​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

Which material is a part of bedrock? siltplantswoodwater
URGENT PLEASE ANSWER!!! Jessica wants to find more information about the effects of sports on the mental health of teenage girls. What would be a good primary s
Calculate the area of a triangle with a base of 6 cm and a height of 12 cm
what kind of intermolecular force is KI(aq)​
Need help asap please! what produces the emf in an electric generator? a coil rotating in a magnetic field to change its flux an electric current in a coil that
Define office as a planning sector​
Where can I read Conversation of birds?
Help help help help help help help help
William is writing a research question to drive his study about the difference between the USDA's recommendations regarding the consumption of dairy products an
Please help me with this!