kimbrachantel2962 kimbrachantel2962
  • 03-03-2020
  • Computers and Technology
contestada

The transition from ____ is initiated by the Job Scheduler according to some predefined policy. At this point, the availability of enough main memory and any requested devices is checked.

Respuesta :

isaacoranseola
isaacoranseola isaacoranseola
  • 04-03-2020

Answer: Hold to ready

Explanation:

This is when the process is waiting to be assigned to a processor. And this is carried out by the short term scheduler, so it can run. This state is immediately after the new state for the process.

Answer Link

Otras preguntas

A function has a constant doubling time. What type of function does this represent? A. Decreasing linear B. Exponential decay C. Exponentia growth D. Increasing
HURRY PLEASE Besides Santa Fe, what other settlements did De Vargas establish in New Mexico?
can somebody do this please
The ruler of Germany during World War I was es 01) A) Karl Marx. B) Wilhelm II. Adolf Hitler. D) Franz Ferdinand.
which TWO regions of georgia could best characterized as "mountainous" 1. appalachian plateau 2. valley & ridge 3.blue ridge 4.piedmont 5. coastal plain
What is (2x66)^56x20^y3 solve it plz right not a fake answer
Since 1960s, it has become more likely for women to vote for which party? A. Republican B. Democratic C. Independent D. Green
match terms w definitions ​
A power washer is being used to clean the siding of a house. Water enters at 20 C, 1 atm, with a velocity of 0.2 m/s .A jet of water exits at 20 C, 1 atm, with
A mason is a person who builds structures with bricks, stone, cement block, or tile. A mason usually uses mortar to hold the bricks together. A general rule of