A critical activity is________________.a. an activity that consumes no time but shows precedence between events. b. a milestone accomplishment within the project. c. an activity with zero slack. d/ the beginning of an event.

Respuesta :

Ritmeks
Ritmeks Ritmeks
  • 09-03-2020

Answer:

C

Explanation:

Critical activity is the sequential activities from beginning to the end of a project. A lot of projects have a single critical path, although some projects may have more than one critical activity which depends on the flow logic utilized in the project.

Answer Link

Otras preguntas

Yo hablo con EL __________ para hacer la llamada de larga distancia.
Please answer question #1
The number of distinct values that can be represented using 5 bits is
What region of africa has no major rivers flowing through it? why?
What does the speed of seismic wave depend on
Propaganda is a plan or method for spreading opinions or beliefs. True or False
The cost of a school banquet is 95$ plus 15$ for each person attending. Write and equation that gives the total cost as a function of the number of epople atten
Hydrogen Bonds are weak, but they hold water molecules together and are difficult to break. Which one of the following images correctly shows hydrogen bonding
Which is correct? Tina recalled that “she had really enjoyed her visit to Virginia.” Tina recalled that, “She had really enjoyed her visit to Virginia.” Tina re
1. The variable ______________ describes how quickly something moves. a) time c) speed b)position d) mass