how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

describe why Portugal in and ottoman turkey involved in the war between the Christian and Muslim state​
katie uses 2 cups of carrots in a casserole that serves 12 people. how many cups of carrots will she use to server 18 people? 1 cup 1 1/2 cups 3 cups 4 cups
Approximate the solution to the equation using three iterations of successive approximation
I just need to fill the table out
I'll give brainliest to whoever solves first correctly Rewrite each equation without using absolute value for the given conditions. y=|x−3|+|x+2|−|x−5|, if x&g
Sontonca Structuro 15 Worksheet 10 Practice With Sentence Structure Homework This page gives practice with concepts from Workshoote 1-9. 1. Writo whether each w
find the value of 85²-15² using the difference of two squares method ​
How to write expressions as the sine, cosine, or tangent of a single angle
solve picture question​
What is the area of the shaded sector of the circle? 20pi units squared 40pi units squared 180pi units squared 400