What is the preferred approach to risk mitigation?

-Tolerate
-Transfer
-Terminate
-Treat

Respuesta :

oeerivona oeerivona
  • 08-01-2021

Answer:

The correct option is;

Terminate

Explanation:

Termination of the risk is equivalent to elimination of the risk by avoiding the activity that brings about the risk or by using a different process that does not include the risk observed in the previous process option

When the reward far outweigh the risk, it may be decided to terminate or eliminate the risk and miss the reward and also terminate the likelihood of the losses to be incurred.

Answer Link

Otras preguntas

Why did the Civil Rights Act of 1875 not protect African Americans from segregation?
If an object is 20 kg box is resting on a table, what is its weight
What convinced the communists to end the Korean War?
NEED HELP ASAP!! define bronze age in own words
find the average rate of change over the given interval f(x) = 2^x , [3,5]
Based on what you know, how would you describe Nancy’s family?
A student is writing a research report on the effects of technology on society. What is the best research question for the student to use? A. Is technology maki
what is the slope of 1,2 and 6,7
Which statement best summarizes a reason in support of the claim that adding a bicycle lane to the two-lane road was poorly planned?
It’s not surprising that Jeremy is so obstinate. His sisters are equally as stubborn about getting what they want, no matter how impossible or challenging it ma