leila839 leila839
  • 03-02-2021
  • Mathematics
contestada

Q11.
It takes 3 painters 2 days to complete a job. Work out how long 1 painter would take.

Respuesta :

26liujiaying
26liujiaying 26liujiaying
  • 03-02-2021

Answer:

6

Step-by-step explanation:

1 painter is 1/3 of 3 painters, so the answer is 2 x 3=6

Hope I helped!

Answer Link

Otras preguntas

please help me on this!
HELPPPPPPPPPP! PLEASEEEE What point does the line pass through?
Blue Sky Jeans Company manufactures jeans. A machine cuts the fabric pieces and workers sew them. One worker con sew the fabric pieces for a 1/2 pair of jeans i
YThe Pew Research Center conducted a survey of 1007 adults and found that 85% of them know what Twitter is. Find a 90% confidence interval for the proportion o
Prepare a list of 5 possible problems that could occur in a contract situation. FIRST ANSWER GET BRAINLIEST
need help with this fast
What kid of soldiers does general Washington witness coming off ships in New York ?
A rectangle has an area of 24 cm. Function f gives the length of the rectangle, in centimeters, when the width is w cm. Determine if each value, in centimeters
Jordan is driving to a concert and needs to pay for parking. There is an automatic fee of $11 just to enter the parking lot, and when he leaves the lot, he will
PLS HELP ASAP [ What is the correct meaning of the word stereotype A.to believe that certain people are better than others B.to recognize the ways in which pe