maaf34nb8f maaf34nb8f
  • 01-04-2021
  • Engineering
contestada

A short framing member that fills the space
between the rough sill and the soleplate is a

Respuesta :

iBear25k
iBear25k iBear25k
  • 01-04-2021

A short framing member that fills the space between the rough sill and the soleplate is a cripple stud.

(HAVE A GOOD DAY!!!)

Answer Link

Otras preguntas

HELP PLEASE factor each polynomial completely using the x-box method. must show work​
Landmark cases create changes in
A beaufort wind scale is used to_____________. A) measure wind speed B) estimate wind direction C) measure wind direction D) estimate wind speed
I cleaned 6/9 of my room, and my friend cleaned 2/9 of my room. How much of my room do we still have to clean?
How many gametes are produced during meiosis
Describe reproduction in gymnosperms ​
Help please You have seen an advertisment in your local newspaper last week.Write a applying for the position of baby sitter as a part-time job for your summer
A recipe includes 4 cups of flour and 2/3 cup of brown sugar. Write the ratio of the amount of flour to the amount of brown sugar as a fraction in simplest form
Which is the most likely to be the actual proportion of defective toys in the population?
Write the ordered pair that represents yz. Then find the magnitude of yz . y(-2,5),z(1,3)