jebrinlayan9000 jebrinlayan9000
  • 02-05-2021
  • Mathematics
contestada

Mr. Kumar is getting his house renovated. 1/5 th of the work has been completed in 2 months. How much time will it take for the entire work to be completed?

Respuesta :

liam2747
liam2747 liam2747
  • 02-05-2021

Answer:

10 months

Step-by-step explanation:

If it takes 2 months to do 1/5th, it will take 4 months to do 2/5, 6 months to do 3/5, 8 months to do 4/5, and 10 months to do 5/5 or in other words the whole thing.

Answer Link

Otras preguntas

find the difference between 12.34 and 10.778. round the answer to the nearest tenths place
what is 2,852.1 rounded to the nearest tenths
How do I solve a problem like this? m-4=2m
What makes Holden depressed in Catcher in the Rye? Can you give a page number and quotation?
order from least to greatest 2.614; 2.146; 2.46; 2.164
Among members of George Washington's cabinet, __________ had a pessimistic view of human nature and a dread of democratic excess. A. Marshall B. Jefferson C.
solve this literal equation2x=4a+2b
the chemical reaction in which an element,such as iron, combines with oxygen to form an oxide is called
Scientists best apply critical thinking in their work through _______. a. the scientific method b. observation c. hypotheses d. experimentation
describe an advance in technology that makes life more enjoyable. what discoveries contribute to this technology?