krishnashrrstha41
krishnashrrstha41 krishnashrrstha41
  • 04-08-2021
  • Mathematics
contestada

15men can complete a piece of work in25days. how many men should be added to complete the same work in15days.​

Respuesta :

mhanifa
mhanifa mhanifa
  • 04-08-2021

Answer:

  • 10 men

Step-by-step explanation:

Amount of work done by 15 men is:

  • 15 men *25 day = 15*25 man*days

Same work can be done by 25 men, in 15 days, so 10 more men should be added.

Answer Link
abovejosh
abovejosh abovejosh
  • 04-08-2021
Answer: 10 men explanation: guy above me
Answer Link

Otras preguntas

22 is 44% of what number?
The plasma membrane is made up of: A. A double layer of cellulose B. A single layer of cellulose C. A double layer of protein D. A double layer of phospholipids
How did archaeologists discover that people of ancient Mesopotamia built on top of earlier ancient cities? A. by deciphering the cuneiform found on clay tablets
Today, the economies of the Pacific Islands rely heavily on which of the following needs? A. sheep, because wool supports the economy B. importing raw materials
what is ten times as much as 0.1
What is the answer to 17=5k-2
22 is 44% of what number?
what does it mean to you to be a thoughtful consumer of media
Relationship B has a greater rate than Relationship A. The graph represents Relationship A. Which table could represent Relationship B? A. Time (weeks) -2- -5-
Kai calculates that he spends 15% of a school day in science class. If he spends 75 minutes in science class, how many minutes does Kai spend in school?