hannahgrace31511 hannahgrace31511
  • 03-11-2021
  • Mathematics
contestada

A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

An individual erroneously believes that the onset of a certain random event is likely to happen following an event or a series of events. A) Illusion of control
If f(x) = (1/7)(7*), what is ſ(3)?
Is m=10,m=-1 parallel or perpendicular
what claim is the author making in paragraph 8? Answer choices for the above question A. We should pay attention to the celebrities who try to make the world
Who was the president during the 1907-1908 school year?
Anthony and Lucas deposited $5,000 into a savings account with 4% interest in euros each year. How much money will Antonio have in the bank if he earns 4% simp
The table shows the lengths of picket fence pieces Jude has to make a flower garden. He wants the garden to have 4 sides and a perimeter of 30 feet
(PLEASE HELP <3) All of the following films were influenced by Shakespeare EXCEPT: A. The Tempest B. Romeo and Juliet C. Sleepless in Seattle D. Shakespeare
ue el escuela (minutos) 20 201 201 202 21 21호 21호 21호 22 B. Lewis dijo que la diferencia entre la vez que llegó más rápido y la vez que más tardó fue 2 minutos.
Which of the following could best be used to demonstrate energy being transformed from electricity to heat? f A gas oven g A triple beam balance h A magnifying