mparrish2965 mparrish2965
  • 03-07-2022
  • Engineering
contestada

A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

H2(g) + CO2(g) + 10 kcal H2O(g) + CO(g) In another experiment involving the above reaction at 1,000°C, the equilibrium concentrations were found to be: H2(g) =
The main purpose of a time line is to show the
What does it mean if something is most essential?
Oil, coal, natural gas, and uranium are used to generate electrical energy. What is true about ALL of them
Everything at a small sit-down dinner party was going beautifully you go to finish off the evening with a flare by bringing in the customers fondue pot which yo
5) Joy and Cullen put some money into their money boxes every week. The amount of money (y), in dollars, in their money boxes after a certain amount of time (x)
How do changes in the money supply affect people and businesses?(please help! 80)
Charles Darwin hypothesized that some individuals would be better equipped for survival than others, and that those that were less equipped would not survive. D
What concepts of the Civil Rights Movement were embraced by the Hippie Movement of the 1960s and 1970s?
The quote putting yourself in another persons shoes is another way of describing