In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

Autoimmune diseases are an example of a(n) ________ response by the immune system.
What substance is produced at the cathode during the electrolysis of a mixture of molten calcium bromide, cabr2(l)cabr2(l), and molten magnesium iodide, mgi2(l)
Paintings are part of india's cultural heritage since the prehistoric period. these reflect various themes like nature, religious ideas, festivals, etc.
I have a house that has no door
Salma owns 40 shares of a certain stock. yesterday the value of each share went up by 4 dollars. what was the total change in value of her shares?
at what layer of the osi model does a network switch normally operate? a. layer 5 b. layer 3 c. layer 4 d. layer 2
You want to encrypt data on a removable storage device. which encryption method would you choose to use the strongest method possible?
Wages (prices) for high-skilled labor have continually risen, despite an increase in people with college and advanced degrees. what is the most logical explanat
What are some reasons why the investment strategy of a 30-year-old might differ from the investment strategy of a 65-year-old?
Find the general solution of the given system of odes. { dx/dt =2x 2y,dy/dt =x 3y}