cristianmart29 cristianmart29
  • 04-04-2018
  • Computers and Technology
contestada

What action is often necessary when installing joists for a cantilever floor?

Respuesta :

idegollacion20
idegollacion20 idegollacion20
  • 14-04-2018
A cantilevered floor is a kind of floor that pops out past the foundation wall below.  Start the joist layout from the longest and strongest run the house or building has. You should also lay floor joists on the stairway's opposing side. Also, remember the 2/3 rule for framing cantilever joists. This means that twice the joist's length should remain inside the structure while the rest sticks out.
Answer Link

Otras preguntas

- ¿Me conoces? Si, A. te conozco B. los conozco C. te conocemos D. nos conoces
Please help me with this
State two factors that can affect the freshness of sauce
Hewp plz it emergency XD
PLEASE HELP!! NEED IT
ways to reduce coal mining damages​
The mean of 7 cm, 15 cm, 12 cm, 5 cm, h cm, and 13 cm is 10 cm. Find the value of h.
Solve the inequality and graph the solution set. -3 ≤ 2x + 3 < 7
Below is a simple set of weights obtained while immersing potato slices in various sugаr solutions over 60 minutes. Time OM sucrose 0.4M sucrose 0.6M sucro
2. According to Father Hooper's explanation at the end of The Minister's Black Veil,* what point is he trying to make by wearing the veil for most of his life?